Skip to content

Deleting Your Organisation ​

Settings → Organisation, at the foot of the page, permanently deletes everything Phanera holds for your authority. It requires the Delete the entire organisation permission, which nothing else in the product grants.

This is the exit route. When your authority stops using Phanera — a contract ending, a move to another supplier, a pilot that did not go ahead — this is how you have the data disposed of, and how you get a certificate saying it was.

There is no undo

After the notice period every record, document, message, report, audit entry and backup belonging to your organisation is destroyed. Support cannot reverse it, and there is nothing left to restore from, because the backups go too.

Take your export first ​

Data Export produces a complete archive of every record and document your authority holds, in open formats, without asking anyone. Take it before you schedule a deletion. Afterwards there is nothing to export from.

Keep the export somewhere you control. It contains a live FOI caseload — requesters' names, their correspondence, their identity documents — so treat it the way you would treat the system it came out of.

Scheduling it ​

Scheduling asks you to type your organisation's name out in full. This is checked by the server as well as on screen, so it is a control rather than a formality.

You can also record a reason. It is optional, and it appears on the certificate — an exit at the end of a contract reads differently from one made in error, and the certificate is the document that has to say which this was.

Nothing is destroyed when you schedule. Your authority carries on working exactly as before throughout the notice period: cases can be received, answered and published, and none of it is made read-only.

Seven days' notice ​

Deletion happens seven days after it is scheduled, at the time it was scheduled. The screen and the email both quote the exact date and time.

Seven days is fixed and cannot be shortened. It is the interlock that makes an irreversible button survivable, and its only value is that nobody — including an administrator having a very bad day — can bypass it. Seven days is long enough to cover an ordinary period of leave, so the person who would notice a deletion nobody authorised has a realistic chance to stop it.

Everyone who can stop it is told ​

When a deletion is scheduled, everyone holding the delete permission is emailed with the date and time, who scheduled it, the reason given, and how to cancel. They are told again if it is cancelled.

Nobody else is emailed. Telling a wider group would alarm people who cannot act on it.

Cancelling ​

Cancel deletion appears in place of the delete button for as long as one is pending, and any holder of the permission can press it — not only the person who scheduled it. That is the whole point of telling every holder.

Cancelling before the date leaves everything exactly as it is. Nothing was deleted in the meantime.

Scheduling again afterwards starts a fresh seven days. A cancelled notice is kept on the record: that somebody scheduled the destruction of the authority and somebody else stopped it is exactly the kind of thing an audit should be able to find later.

What is destroyed ​

Everything the organisation holds:

  • Every request, its correspondence, its attachments and its response drafts
  • Identity documents, redacted copies, and the extracted text behind document search
  • Every department, request type, category, exemption, template, portal, dashboard and report
  • Email pipelines, integrations, API tokens and storage connections
  • The complete audit trail — access logs, admin logs, case timelines, email logs
  • Every backup archive and every export archive still in storage

The files go as well as the records. Each stored document, image and archive is removed from object storage in the same operation.

User accounts are deleted where the person belongs to no other organisation on the platform. Somebody who also holds a role at another organisation keeps their account and their access there; all that happens to them is that their link to your organisation is removed. Deleting them outright would sign them out of an authority that has not gone anywhere.

A membership elsewhere counts even if that organisation has deactivated them. They were deactivated, not removed, and that organisation can still reinstate them — which it could not do if your exit had deleted the account.

This includes Phanera's own staff. An engineer given a role in your organisation to help with something, and holding one nowhere else, is deleted along with everybody else. There are no exemptions in the rule at all — not for support accounts, not for anyone.

One rare consequence

Removing somebody from an organisation keeps their name on that organisation's closed cases. So an officer who worked at two authorities, was removed from the second, and whose only remaining membership was with you belongs nowhere once you leave, and their account goes.

The second authority loses the assignment link on those closed cases, which cannot outlive the account. It does not lose the record of who did the work: case timelines store names as text rather than as links to accounts, precisely so they survive an account being renamed, deactivated or deleted. The certificate reports the number either way.

What is kept ​

Only the certificate, described below. It records that the deletion happened and holds no case data.

Nothing else survives. Records shared with the platform — national bank holiday calendars, the subscription plan catalogue — were never your authority's data and are unaffected.

The certificate ​

The certificate is sent before the deletion runs, not after. Everything it reports is counted while your organisation is still there, the certificate goes out, and only then is anything destroyed.

That ordering is deliberate. The certificate is the one thing you are left holding, so the irreversible step is never taken without it having been sent — sending it afterwards would mean a mail server having a bad afternoon could destroy your data and tell nobody. If the deletion then fails, or a file cannot be removed from storage, you are sent a correction; nothing is left to be discovered.

Everyone who was told the deletion was coming receives it. It carries:

  • A certificate reference, unique across the platform
  • Your organisation's name
  • Who requested the deletion, and when
  • When it completed
  • How many records, files and user accounts were destroyed
  • Any case-assignment links another organisation lost alongside a deleted account (almost always none)
  • A per-table breakdown of the records

The breakdown is there so the figures can be reconciled against the export you took, table by table. A total on its own asks to be taken on trust.

Keep the certificate. It is the evidence your authority needs for its own retention and disposal records, and it is the only thing that outlives the deletion.

If the certificate is mislaid, quote its reference to support and it can be reissued — there is no organisation left to sign in to, so that is the only route back to it.

If a file could not be removed

Very occasionally a storage backend refuses a deletion. Every database record still goes, and you are sent a short correction saying how many files remain — the retained certificate records the shortfall too. Those files are reported for manual removal.

If the deletion does not complete

It runs as a single transaction, so it either finishes or leaves everything exactly as it was — there is no half-deleted state. If it fails you are emailed to say so and to disregard the certificate you were sent, because your data is still held. The failure is recorded for us to act on, and your organisation is not left scheduled for deletion in the meantime.

Who should hold this permission ​

The Delete the entire organisation permission is granted to the Admin role in new organisations and to nobody else. It is deliberately separate from Manage Backups: being trusted to take a copy of the caseload is not the same as being able to destroy it, and an authority that wants the first without the second should be able to say so.

If your organisation was created before this feature existed, no role holds the permission yet — permissions added to the product do not appear on existing roles by themselves. An administrator grants it in Roles & Permissions, under Export, Backups & Deletion.

Grant it to the fewest people who could ever need it, and to enough of them that somebody is always available to cancel. A deletion that only its author could stop is one that survives its author going on leave.

Phanera — FOI, SAR, EIR & Complaints management