Standard Measures ​

How every figure Phanera reports is calculated. Two people reading the same compliance percentage should be able to agree on what it counts, and an auditor should be able to reproduce it from a data export.

Read this alongside the Data Dictionary, which defines the underlying columns, and Reports, which describes where each measure appears.

Two different compliance rates

The Compliance Report and the Workload Report both publish a figure called compliance rate, and they do not use the same denominator. That is deliberate — one measures an organisation's statutory position, the other an officer's completed work — but it means the two numbers can legitimately differ. Both are defined below.

Foundations ​

MeasureDefinition
Working dayA day that is not a Saturday, Sunday or bank holiday for the organisation's configured region. Bank holidays come from the GOV.UK Bank Holidays API and are filtered to the region set in Settings → Organisation, so a Scottish authority works through the English August bank holiday and stops on its own
Date receivedThe date the request reached the authority, not the date it was entered into Phanera. For a migrated case it is the date recorded by the previous system, so compliance history recomputes on the original receipt date
Deadline dateCalculated in working days from the date received against the rules for the request type. It may be extended (public interest test, complex request), suspended (clock stop), recalculated by a change of request type, or set by hand. A hand-set deadline is flagged and carries a written reason; the calculated date is retained beside it
Response sentThe timestamp the substantive response issued. A request with no response-sent timestamp has not been responded to, whatever its status
ClosedStatus Closed or Transferred. These are the two terminal statuses; a request in any other status is open

Exclusions ​

Trashed and spam requests are excluded from the Compliance, Volume, Overdue, Response Time and Costs reports. They are not part of the statutory caseload, and including them would understate compliance by counting work the authority was never required to do.

Everything excluded remains in the record and in the export — it is excluded from the measure, not deleted.

Compliance Report ​

The organisation's statutory position. Every request in the period falls into exactly one of four states:

StateCondition
Responded in timeA response was sent, and it was sent on or before the deadline
Responded lateA response was sent, and it was sent after the deadline
Open and overdueNo response sent, not closed or transferred, and the deadline has already passed
Not yet respondedNo response sent, not closed or transferred, and the deadline has not yet passed
                          responded in time
compliance rate  =  ----------------------------------------  x 100
                    responded in time
                    + responded late
                    + open and overdue

Rounded to one decimal place. Zero when the denominator is zero.

Why in-flight requests are excluded from the denominator

A request that is still open and still inside its deadline has neither succeeded nor failed. Counting it as non-compliant would make the rate fall every time a new request arrives; counting it as compliant would make it rise. It is reported separately as not yet responded and enters the denominator only once it is answered or breaches.

An open request already past its deadline is counted as late. A breach is a breach whether or not the response has caught up yet — otherwise an authority could hold its compliance rate up indefinitely by not answering.

Monthly trend. Closed requests are bucketed by the month the response was sent. Open-overdue requests are bucketed by the month their deadline fell — the month they breached — so a breach appears in the month it happened rather than the month it is eventually cleared.

Overdue Report ​

MeasureDefinition
Days overdueCounted in working days since the deadline, not calendar days. A request three calendar days past its deadline over a bank holiday weekend shows as one

Response Time Report ​

MeasureDefinition
Average response timeMean working days from date received to response sent, over requests closed in the period, grouped by staff member. Rounded to one decimal place

Workload Report ​

Each officer's current load beside their completed work.

MeasureDefinition
Open requestsRequests assigned to them and still open, as at now
OverdueOf those open requests, how many are already past their deadline. Currently in breach — not answered late
Requests handledRequests they closed within the reporting period
Average response timeMean working days to respond, over the requests they closed in the period
Compliance rateOf the requests they closed in the period, the share answered on or before the deadline, × 100, to one decimal place
                            closed in period, answered in time
workload compliance rate =  ----------------------------------  x 100
                                   closed in period

The date filter applies to completed work only

Open requests are the officer's load now, so they are not filtered by the date range. Narrowing the range changes the completed columns and leaves the open ones alone. Everyone with either open work or completed work in the period appears — an officer holding twenty overdue cases and nothing closed is exactly who this report is for.

The denominator here is requests closed in the period, not the statutory denominator above. An officer's open-overdue cases lower the organisation's compliance rate but do not lower theirs until the cases are answered.

Costs Report ​

Section 12 time and cost, from time logged against a case.

MeasureDefinition
Total hoursSum of hours logged across the four activities the fees regulations allow: determining whether the information is held, locating it, retrieving it, and extracting it
Total costHours × the configured hourly rate. The rate defaults to £25 and the appropriate limit to £450, both configurable
Requests with logged timeCount of requests carrying at least one cost activity

Exemptions Report ​

Counts of exemptions and exceptions cited on refused requests, by exemption. Each citation is snapshotted at the moment the refusal issues, so a later edit to the exemption library does not change what a historical report says was cited.

ICO Annual Return ​

Computed as at the financial year end for FOI requests only, in the fields the Information Commissioner's Office asks for. It uses the same definitions as the Compliance Report above.

Power BI feeds ​

The Power BI datasets pre-derive the columns a management pack would otherwise have to rebuild, so the definitions here and the ones in a dashboard cannot drift apart:

ColumnDefinition
Compliance bandOverdue, Due this week, Due next week, or Within timescale — calculated on calendar weeks from the deadline
Days overdueAs the Overdue Report above: working days past the deadline
Open flagTrue when the request is not closed or transferred
DirectorateThe owning department; Mixed where a case is allocated across more than one

Reproducing these from an export ​

Every measure above is derived from columns present in a full data export — principally Requests.DateReceived, Requests.DeadlineDate, Requests.ResponseSentAt, Requests.Status and RequestCostActivities. Nothing is computed from data that stays behind, which is what makes the figures auditable rather than merely published.